Well Drilling Rig for Uman IslandPALIKIR, Pohnpei (FSM Information Service): October 14, 1997 - President Jacob Nena, on October 8, 1997, responded to a letter which Congress Speaker Jack Fritz requested in assistance of the Office of Planning and Statistics (OPS) for well drilling on Uman Island in Chuuk. In his response, President Nena said that OPS has received a price quotation of CIF price $31,701 for small drilling rig and ancillary equipment, tolls and spare parts, from China Friendship Development International Engineering and Design and Construction Cooperation. Which is similar to that used on Fais Island in Yap which drilled six inch boreholes to the depth of up to 60 feet. With funds readily available, Nena wrote, the drilling rig can be purchased and delivered within six weeks of ordering. Nena concluded by saying that arrangements are being made to send a team to Uman Island during the first week of November, to select sites for the wells, tanks and pipelines and that he will advise Fritz on the exact dates when finalized. |